The Al Bada Canal water project: Its Construction Aspects and importance for Drinking water Supply projects of Basrah Province

Authors

  • حمدان باجي نوماس جامعة البصرة / كلية التربية للعلوم الانسانية
  • عبدالحسن عبد النبي هاشم وزارة التربية / مديرية تربية البصرة

DOI:

https://doi.org/10.31185/eduj.Vol1.Iss44.2288

Abstract

      This paper focuses on Al Bada Canal Water project which starts from Al Bada distric downstream of AL Garhaf river at Nassiriya and end at Basrah province which suffers from water deficit throughout the year. The Canal total is 238.5 KM. It has 196 construction plants, two pumping stations and three Syphons average discharge is 21m3cumics of which 6 m3 and 15m3 to Nassiriya andBasrah respectively. The project has low efficiency compared to the demands due to several problems which influence water quality and quantity.

Downloads

Download data is not yet available.

Downloads

Published

2021-08-29

Issue

Section

Articles

How to Cite

باجي نوماس ح. . ., & عبد النبي هاشم ع. . (2021). The Al Bada Canal water project: Its Construction Aspects and importance for Drinking water Supply projects of Basrah Province. Journal of Education College Wasit University, 1(44), 205-230. https://doi.org/10.31185/eduj.Vol1.Iss44.2288